Progress at Chantry Barn during 2005
june
Work starts on the southwest and southeast frames, the plinth walls and footings
july
The southeast and northeast plinth walls need replacing
august
A new footing for the plinth wall under the east gable
september
The plinth wall is rebuilt and the Beam Team return
october
More drains, bricklaying and preparation for the concrete floor
november
The concrete floor goes down
december
Some minor frame repairs and the cladding of the outside with plywood